King George V College

Macadam MUGA Conversion to 3G Facility

Working for King George V College the CLS Sports team transformed their old macadam MUGA area into a multi-use, floodlit, 3G facility.

The new all-weather surface replaced 43mx33m of the existing macadam court area and slightly extending into the car park.

The project involved the removal of the existing fencing, preparations to the existing macadam area and the construction of the extension along with the installation of a new drainage system. Once all the base preparation work was completed CLS Sports then installed the new 3G surface and the associated sand and rubber infill. 4.5m wire mesh fencing was then installed to the pitch perimeter, along with a floodlighting system that would facilitate use during evenings and throughout winter enabling the college to use the facility to its full potential.